HowToDIYConcrete.com is supported by readers and may earn an affiliate commission.

Rather have a pro do it for you?

Tools and Supplies to Install Concrete Footings
1 Shovel
2 Post hole digger
3 Wheelbarrow
4 Tamper
5 Concrete mixer
6 Level
7 Measuring tape
8 Hammer
9 Stakes
10 String line

How to Install Concrete Footings

Step-by-Step Guide: Installing Concrete Footings for Your Construction Projects

Installing concrete footings is an essential part of any construction project that requires a solid foundation. Whether you’re building a deck, a shed, or a house, the footings are what will keep the structure stable and secure. Here’s a step-by-step guide on how to install concrete footings:

1. Determine the size and location of the footings: The size and location of the footings will depend on the size and weight of the structure you’re building. Consult the building plans and local building codes to determine the size and location of the footings.

2. Excavate the area: Use a shovel or an excavator to dig a hole for the footing. The hole should be deep enough to reach below the frost line and wide enough to accommodate the size of the footing.

3. Level the bottom of the hole: Use a level to ensure that the bottom of the hole is level. This will ensure that the footing will be level and stable.

4. Add gravel: Add a layer of gravel to the bottom of the hole. This will provide drainage and prevent water from accumulating around the footing.

5. Install rebar: Install rebar in the hole. The rebar should be placed in a grid pattern and should be tied together with wire. This will provide additional strength and stability to the footing.

6. Mix the concrete: Mix the concrete according to the manufacturer’s instructions. The concrete should be a consistency that is easy to work with but not too runny.

7. Pour the concrete: Pour the concrete into the hole. Use a shovel or a concrete pump to fill the hole. The concrete should be poured to the top of the hole.

8. Smooth the surface: Use a trowel to smooth the surface of the concrete. The surface should be level and free of any bumps or ridges.

9. Allow the concrete to cure: Allow the concrete to cure for at least 24 hours. The curing time will depend on the temperature and humidity of the area.

10. Backfill the hole: Once the concrete has cured, backfill the hole with soil. The soil should be packed tightly around the footing to provide additional stability.

By following these steps, you can install concrete footings that will provide a solid foundation for your construction project. Remember to consult the building plans and local building codes to ensure that the footings are the correct size and location for your project.